Highway Construction

PROJECT: U.S. 95 Sand Creek Byway Project LOCATION: Sandpoint, Idaho OWNER: Idaho Transportation Department DESIGNERS: Washington Group International…
Gradall acquires VACALL industries
Gradall acquires VACALL industries
Gradall Industries Inc. has taken over all VACALL product manufacturing, engineering and parts fulfillment in Ohio. Known worldwide for uniquely…
CEMEX produced concrete that achieved 450 psi flexural (3.1 MPa) strength in 3 1/2 hours. The pavement was opened to truck traffic four hours after concrete placement. The project was completed in one day and minimized the closure of the entrance to Fairplex. Thanks to CEMEX and the project team, the Los Angeles County Fair facility was back in business.
CEMEX produced concrete that achieved 450 psi flexural (3.1 MPa) strength in 3 1/2 hours. The pavement was opened to truck traffic four hours after concrete placement. The project was completed in one day and minimized the closure of the entrance to Fairplex. Thanks to CEMEX and the project team, the Los Angeles County Fair facility was back in business.
CEMEX produced concrete that achieved 450 psi flexural (3.1 MPa) strength in 3 1/2 hours. The pavement was opened to truck traffic four hours after…
Subscribe to Highway Construction
expand_less