
September 2018


The fixed $916 million contract for the design and construction of the Loop 202 South Mountain Freeway made it the largest single highway project in Arizona’s state history.
Loop 202 project fills void in Arizona transportation

Most owners in the surface transportation industry have mastered design-build delivery. The concept of P3s becomes much less intimidating when an agency is experienced in design-build.
Deals show promise, potential as more DOTs use them

New I-74 crossing in Quad Cities spurring growth and connectivity between Illinois and Iowa

NJDOT completed the superstructure replacement over Jones Road in October 2017.
Reconstruction project in Fort Lee, N.J., exemplifies teamwork and ABC success

About a mile of SH 6 in Harris County from Clay Road to I-10 was covered with up to 7 ft of water for two weeks due to flooding from Hurricane Harvey.
Weird occurrence in the wake of Hurricane Harvey calls on Texas DOT to investigate, monitor

Figure 1. TMA light configurations investigated in the study.
Green light on TMAs could be another option for DOTs

The Chesapeake Bay Bridge-Tunnel sees 11,000 vehicle crossings per day, which increases to 25,000 daily crossings during the peak summer season.
Crews focused on tricky soil as Chesapeake Bay Tunnel project amps up