Trivia Tuesday, Nov. 17

Test your roads and bridges industry knowledge in our weekly trivia series!

Last week's answer

Question: When Portland's iconic Fremont Bridge was constructed over the Willamette River in 1973, civil engineers faced a monumental task: installing the bridge's massive 6,000-ton steel center arch span. At the time, it set a Guinness World Record for the heaviest structural lift in history. How did engineers physically move and install this giant center span into its final position?

Answer: They built the span on barges upstream, floated it down the river, and hydraulically jacked it straight up 170 feet into place.

Built in California, the arch span was assembled on Swan Island and then floated the 1.7 miles to the bridge site on barges. Strand jacks then lifted the span into position. This method was found to minimize costs and navigation impacts. 

Source: Florida International University