March 2018

Bill Wilson
Editorial/Commentary March 2018

Trump’s plan, budget does not add up to much


The Fast Lane Grant provided $60 million for a $183 million road project on I-10. Image: LADOTD

Highway Construction March 2018

A status report on Louisiana, Mississippi and Alabama

I-65 resurfacing Kentucky
Asphalt Paving March 2018

Resurfacing and interchange rescue in Bowling Green, Ky., earns NAPA recognition

U.S.  74 Charlotte

Image: NCDOT

Asphalt Paving March 2018

Contractor takes over widening project in Charlotte, N.C.

U.S. Rte. 17-74-76

NCDOT wanted to expand U.S. Rte. 17-74-76 from four lanes to six lanes.

Asphalt Paving March 2018

Contractor has strong performance on N.C. job

Ultra thin overlay
Asphalt March 2018

Ultra thin overlays can have more muscle

Alaska precutting
Asphalt Maintenance March 2018

Alaska looks at precutting to reduce cracking

I-90 Cuyahoga County

I-90 in Cuyahoga County was one of the locations where ODOT installed longitudinal diamond grooving.

Asphalt March 2018

Ohio DOT turns to grooving to improve safety

asphalt fatigue cracking
Asphalt Testing March 2018

Asphalt cracking test ready for expanded use

David Matthews
Roads Report March 2018

These odd pairings have drivers doing a double take

Larry Caudle
Law March 2018

On the importance of characterizing differing site conditions

Overlay Init