Cost: $2,579,535 (U.S.) Length: 211,200 ft % RAP Used: 100% Milling Depth: 2 in. Cost Savings: $1,719,690 Designer: British Columbia Ministry of Transportation Owner: British Columbia Ministry of Transportation Contractor: Peters Bros. Construction Ltd. Located in a mountainous region, the Fraser Lake HIR project was a race against the clock. The area had a limited summer calendar, with the average minimum ambient temperature ranging from 38.8°F in June and 42.3° F in August. The pavement that was replaced was 25 years old and had an extensive amount of alligator cracking.

Sponsored Recommendations

The Science Behind Sustainable Concrete Sealing Solutions

Extend the lifespan and durability of any concrete. PoreShield is a USDA BioPreferred product and is approved for residential, commercial, and industrial use. It works great above...

Powerful Concrete Protection For ANY Application

PoreShield protects concrete surfaces from water, deicing salts, oil and grease stains, and weather extremes. It's just as effective on major interstates as it is on backyard ...

Concrete Protection That’s Easy on the Environment and Tough to Beat

PoreShield's concrete penetration capabilities go just as deep as our American roots. PoreShield is a plant-based, eco-friendly alternative to solvent-based concrete sealers.

Proven Concrete Protection That’s Safe & Sustainable

Real-life DOT field tests and university researchers have found that PoreShieldTM lasts for 10+ years and extends the life of concrete.