September 2014

Bridge Rescue September 2014

Caltrans handles variety of challenges with pronged approach

Maintenance September 2014

Failure creates landslide, closes historic U.K. tunnel

Maintenance September 2014

In the U.K., contractors are in charge of the road and bridge networks

Bridges September 2014

Accelerated construction used for Bahrain bridge

The NGCS consists of diamond grooving a surface using 3.2-mm-wide longitudinal grooves saw-cut to a depth of 3-5 mm at 12.5- to 16-mm centers.

Concrete September 2014

New diamond grinding technique in Australia takes pavement noise to a new level

Bridges September 2014

Chongqing features China’s span giants

Asphalt September 2014

Contractor team takes on bigger portion in Alberta

Asphalt September 2014

Boston’s Arborway project brings neighborhoods back together

Winter Maintenance September 2014

Following polar vortex, officials ready for more

Maintenance September 2014

Winter of 2013-14 challenged public works officials across the country

Maintenance September 2014

Iowa DOT assists maintenance personnel on the go

Maintenance September 2014

Research looks at effectiveness of FAST system

Maintenance September 2014

Michigan’s network of road sensors prove their worth during brutal winter

Overlay Init