No. 7 - Winona Bridge

Jan. 4, 2015

As Minnesota’s first CMGC project, the Winona Bridge features a 450-ft main span over a commercial navagational channel. Carrying southbound TH 43 traffic over the Mississippi River, the new bridge, which replaces a two-lane truss structure that sits on the National Register of Historic Places, will more than double capacity and connect the community of Winona with counties in Wisconsin, bolstering interstate commerce. A deck-level sidewalk, lit by LED accents, will provide pedestrain access across the river and serve as a riverview overlook for residents and tourists alike.

WINONA BRIDGE

LOCATION: Winona, Minn.

COST: $79.6 million

LENGTH: 2,295 ft

DESIGNER: FIGG

CONTRACTOR: Ames Construction

OWNER: Minnesota Department of Transportation

Sponsored Recommendations

The Science Behind Sustainable Concrete Sealing Solutions

Extend the lifespan and durability of any concrete. PoreShield is a USDA BioPreferred product and is approved for residential, commercial, and industrial use. It works great above...

Powerful Concrete Protection For ANY Application

PoreShield protects concrete surfaces from water, deicing salts, oil and grease stains, and weather extremes. It's just as effective on major interstates as it is on backyard ...

Concrete Protection That’s Easy on the Environment and Tough to Beat

PoreShield's concrete penetration capabilities go just as deep as our American roots. PoreShield is a plant-based, eco-friendly alternative to solvent-based concrete sealers.

Proven Concrete Protection That’s Safe & Sustainable

Real-life DOT field tests and university researchers have found that PoreShieldTM lasts for 10+ years and extends the life of concrete.