Number 10: Fremont Bridge Approach Replacement

Bridges Products
Printer-friendly version

The contractor had to cut a four-lane bridge down the centerline to maintain two lanes of traffic throughout the project. Efforts were made to minimize noise and vibration to sensitive adjacent businesses. Work is being done in confined right-of-way in an old urban setting.

Location: Seattle, Wash.

Cost: $30 million

Length: 1,000 ft

Type: Concrete and steel bascule

Designer: Parsons Brinckerhoff

Owner: City of Seattle

Contractor: Mowat Construction