Sherwin-Williams-Walt-Whitman-Bridge-400px

Rehabilitating the Walt Whitman Suspension Bridge: A Massive Feat in Engineering and Coordination

Sept. 20, 2021

Restoration of the Walt Whitman Suspension Bridge was a massive project that faced logistical, engineering, and coating challenges. Applicators had to work around automobile traffic; create a containment system; build access platforms; raise scaffolding to 378 ft; and coat steel surfaces in all weather, including the colder winter months. Over 918 days, the crew blasted and prepped surfaces, and applied a Sherwin-Williams primer, intermediate coat and topcoat, ensuring the preservation of this historic bridge.

Click the link below to download this white paper.

------------

Editor's Note: Scranton Gillette Communications and the SGC Infrastructure Group are not liable for the accuracy, efficacy and validity of the claims made in this piece. The views expressed in this content do not reflect the position of the Roads & Bridges' Editorial Team.

------------