Montana Department of Transportation Evaluates Highway Bridge Deck Design

Nov. 9, 2006

Amidst a vast expanse of farming and rangelands, bridge designers from the Montana Department of Transportation (MDT) recognized a unique opportunity to evaluate highway bridge deck design. Near the small town of Saco, Mont., three bridges were constructed less than one mile apart along the same highway corridor, Montana Rte. 243. Consequently, each bridge will experience identical demands from weather, traffic and winter maintenance.

Amidst a vast expanse of farming and rangelands, bridge designers from the Montana Department of Transportation (MDT) recognized a unique opportunity to evaluate highway bridge deck design. Near the small town of Saco, Mont., three bridges were constructed less than one mile apart along the same highway corridor, Montana Rte. 243. Consequently, each bridge will experience identical demands from weather, traffic and winter maintenance.

Each bridge has three 15-m spans, incorporating a reinforced concrete deck-on-prestressed stringer design with identical global dimensions and substructure components. The only difference among the bridges is the composition of the reinforced concrete deck. The conventional deck represents the standard deck used in Montana, a conventional concrete with a standard rebar pattern. The empirical deck also uses conventional concrete, but employs approximately one-third the amount of reinforcing steel. The high-performance concrete (HPC) deck uses a standard rebar pattern with a high-strength concrete. MDT contracted with The Western Transportation Institute (WTI) at Montana State University to design and install an instrumentation system, acquire data and perform subsequent analysis to evaluate the performance of the three bridge decks.

Instrumentation
During the planning phases of the project, finite element analysis was done on the three deck configurations to identify critical locations in the bridge decks for placing strain gages. Based on this analysis, the instrumentation is primarily concentrated in a single driving lane of one 15-m span of each three-span bridge (approximately one-sixth of the bridge). The strain gages were placed in each bridge deck prior to casting the concrete. The gauges were positioned to monitor both longitudinal and transverse strains at three different depths through the thickness of the deck. Three different strain gauge technologies were used in each bridge: 35 Vishay foil strain gauges bonded to reinforcing steel, 7 Vishay embedment-type strain gauges suspended in the concrete and 16 Geokon vibrating wire strain gauges suspended in the concrete. Additionally, 16 temperatures are recorded via thermistors internal to the vibrating wire strain gauges. To monitor ambient conditions, a weather station was erected at the Saco Public School, located approximately one mile from the bridge sites. Temperature, barometric pressure, wind speed/direction and relative humidity values are measured at 15-minute intervals and posted to the Internet for public viewing.

Data Acquisition
All strain data is collected and stored using a single CR5000 Measurement and Control System mounted under each bridge. The bonded and embedded gauges require Wheatstone Bridge arrangements designed and fabricated by WTI. Corresponding voltages are routed through a single AM16/32 multiplexer . Vibrating wire strains and temperatures are read using a single AVW1 Vibrating Wire Interface coupled with an AM16/32 multiplexer . All gauges are read once every hour. Data from each bridge is periodically transmitted to WTI through the Internet via a network of RF400 Spread Spectrum radios based at the Saco School. Weather data is monitored using a CR10X Measurement and Control System and transmitted directly to WTI via the Internet.

Long-Term Evaluation
One of the primary objectives of the Saco Bridge Deck Evaluation is the comparative analysis of long-term bridge deck performance. This objective will be accomplished through qualitative and quantitative analyses of bridge deck conditions over a two-year period. Ideally, the project will be extended for several years to more fully evaluate relative deck performance throughout their service lives. Qualitative analyses include crack mapping and surveying operations. Quantitative analyses are mostly focused on how strains in the bridge decks change when exposed to changing weather conditions and vehicle load events. In addition to hourly monitoring of deck conditions, a subset of the strain gauges remains continually active to capture "large vehicle events." When calibrated against portable weigh-in-motion (WIM) traffic records, large event data will offer an estimate of the cumulative demands placed on the bridges from traffic loading.

Live Load Testing
A second objective of this project is to compare the load carrying mechanisms of the three bridge decks. This objective is being realized by a series of live load tests. Before being opened to traffic, heavily loaded vehicles were driven slowly along the full length of each bridge along several different longitudinal paths.

During each test event, 41 channels of rebar-bonded and concrete-embedment strain gauge data were recorded. To accommodate the number of sensors in each bridge and a rapid data acquisition rate, all three CR5000s were simultaneously used during live load testing. Longitudinal positioning of the truck during the test was recorded via a hand-held electronic button, engaged as the test truck traveled every two meters along the deck. In addition to the local deck strains recorded by the internal strain gauges, global behaviors were monitored using gauges temporarily affixed to the bottom of the stringers, supplied by Bridge Diagnostics Inc. (BDI). A majority of the tests were conducted using one tandem-axle dump truck. To simulate "worst-case" behavior, two vehicles were driven side by side along the length of the bridge. High-speed tests were also conducted using a single truck traversing the bridge at 60 mph. A second live load test is scheduled to take place after the bridges have been in service for two years.

Outcome
At present, comparative investigation of bridge deck behavior with this level of detail and control of variables has been limited. This study presents a unique opportunity to develop a better understanding of local reinforced concrete bridge deck behaviors and load paths through the deck and substructure.

Researchers and departments of transportation alike will benefit from a heightened understanding of bridge deck performance under vehicle loading and varying long-term weather conditions. Application of this knowledge will lead to better planning for infrastructure health as well as improved bridge deck design.

Sponsored Recommendations

The Science Behind Sustainable Concrete Sealing Solutions

Extend the lifespan and durability of any concrete. PoreShield is a USDA BioPreferred product and is approved for residential, commercial, and industrial use. It works great above...

Proven Concrete Protection That’s Safe & Sustainable

Real-life DOT field tests and university researchers have found that PoreShieldTM lasts for 10+ years and extends the life of concrete.

Revolutionizing Concrete Protection - A Sustainable Solution for Lasting Durability

The concrete at the Indiana State Fairgrounds & Event Center is subject to several potential sources of damage including livestock biowaste, food/beverage waste, and freeze/thaw...

The Future of Concrete Preservation

PoreShield is a cost-effective, nontoxic alternative to traditional concrete sealers. It works differently, absorbing deep into the concrete pores to block damage from salt ions...