Four columns tilted as much as 4% out of vertical alignment. Read the report.
Agency’s goal is to open the span as quickly as possible. Read the report.
U.S. DOT issues emergency funds to repair ailing I-495 bridge. Read the report.
Span might be open by the Labor Day holiday. Read the report.