Twelve million dollars in savings has been targeted by the team working on the replacement of the Sarah Mildred Long Bridge that crosses the Piscataqua River between Portsmouth, N.H., and Kittery, Maine. The original estimate of $172 million has been reduced to $160 million. This figure includes the design, engineering, property acquisition and construction of the new bridge. The bridge is slated for replacement in 2014.