View All

I-90 Resurfacing

Recent Videos

/road-bridge-repair-challenges-solved-concrete-cloth-gccm
Road & bridge repair challenges solved with Concrete Cloth GCCM
Road & bridge repair challenges solved with Concrete Cloth GCCM

Learn how flexible, durable Concrete Cloth can help simplify complex, costly infrastructure challenges such as culvert rehabilitation, ditch lining, erosion control and more.

/magma-cracksealers
Magma cracksealers
Magma cracksealers

Simple, safe and reliable describes the new Magma cracksealers in safety green for 2016. Quietest operation, best operator visibility and new ergonomic wand.

/video-ohio-river-bridges-project%E2%80%94traffic-and-safety-improvements
VIDEO: Ohio River Bridges project—traffic and safety improvements
VIDEO: Ohio River Bridges project—traffic and safety improvements

Construction crews on the Ohio River Bridges Project Downtown Crossing are working to change the landscape of downtown Louisville, Ky., and southern Indiana. The addition of lanes and the reduction of conflict points on the project are helping to improve traffic flow and safety. 

/video-kennedy-bridge-improvement-project
VIDEO: Kennedy Bridge improvement project
VIDEO: Kennedy Bridge improvement project

Workers with the Kentucky Transportation Cabinet (KYTC) are redoing the Kennedy Interchange where I-65, I-71 and I-64 all come together in downtown Louisville. The 52-year-old John F. Kennedy Memorial Bridge, which connects Kentucky to Indiana over the Ohio River, will carry six lanes of I-65 southbound traffic. Work on the bridge involves replacing the old deck and stringers.

 

/video-flint-river-bridge-birch-run-outlet-bridge-project
VIDEO: Flint River Bridge / Birch Run Outlet Bridge project
VIDEO: Flint River Bridge / Birch Run Outlet Bridge project

In Michigan’s Bay Region, the Michigan Department of Transportation has a unique project involving replacing two bridges at both the Flint River and the Birch Run Outlet, and building approximately 3,800 ft of new roadway. The new Flint River Bridge is 272 ft longer and 6 ft higher, while the bridge over the Birch Run Outlet is 15 ft longer and 7 ft higher than the existing bridges.

/video-i-290390-interchange-project-update
VIDEO: I-290/390 Interchange project update
VIDEO: I-290/390 Interchange project update

The I-290 Interchange project and the Illinois Route 390 project are part of the Illinois Tollway's Elgin-O'Hare Western Access Project. Scheduled to be complete in 2017, the I-290 Interchange project will include 17 ramps and 15 new bridges in the interchange area, and will create direct access with free-flow traffic movements to and from Illinois Route 390 in all directions. 

/video-udot-region-two-news-brief-july-2016
VIDEO: UDOT Region Two news brief - July 2016
VIDEO: UDOT Region Two news brief - July 2016

The Utah Department of Transportation (UDOT) provides construction updates for the month of July, including project information on the Bargerter Highway 600 West Interchange, the Mountain View Corridor project in West Valley City, and the resurfacing of SR-210 (Wasatch Blvd.) between Big and Little Cottonwood canyons. 

/video-sr-232-i-15-utah
VIDEO: S.R. 232 & I-15 Utah
VIDEO: S.R. 232 & I-15 Utah

This accelerated bridge construction project in Salt Lake City, Utah, made use of a slide-in-place technique to avoid traffic disruption—entirely.

Asphalt View all 50 items

/video-i-290390-interchange-project-update
VIDEO: I-290/390 Interchange project update

The I-290 Interchange project and the Illinois Route 390 project are part of the Illinois Tollway's Elgin-O'Hare Western Access Project. Scheduled to be complete in 2017, the I-290 Interchange project will include 17 ramps and 15 new bridges in the interchange area, and will create direct access with free-flow traffic movements to and from Illinois Route 390 in all directions. 

VIDEO: I-290/390 Interchange project update
/video-udot-region-two-news-brief-july-2016
VIDEO: UDOT Region Two news brief - July 2016

The Utah Department of Transportation (UDOT) provides construction updates for the month of July, including project information on the Bargerter Highway 600 West Interchange, the Mountain View Corridor project in West Valley City, and the resurfacing of SR-210 (Wasatch Blvd.) between Big and Little Cottonwood canyons. 

VIDEO: UDOT Region Two news brief - July 2016
/video-jane-byrne-interchange-construction-update-2016
VIDEO: Jane Byrne Interchange construction update 2016

The Jane Byrne Interchange in Chicago is the meeting place for the I-90 Kennedy Expressway, the I-290 Eisenhower, and the I-94 Dan Ryan. The northwest flyover project will allow traffic to flow unimpeded from the Dan Ryan to the city's outlying suburbs. The 2016 construction season is expected to be one of robust progress as crews press toward the goal of opening the flyover bridge to late fall traffic.

VIDEO: Jane Byrne Interchange construction update 2016
/video-diberville-diverging-diamond-interchange
VIDEO: D'Iberville Diverging Diamond Interchange

With the recent economic boom felt throughout the City of D’Iberville comes an increase in traffic throughout the I-10 corridor. To help accommodate this growth, the Mississippi Department of Transportation (MDOT) has implemented Mississippi’s first Diverging Diamond Interchange (DDI). This new design is being implemented across the country as a safer and more cost-efficient alternative to traditional interchanges. 

VIDEO: D'Iberville Diverging Diamond Interchange
/asphalt-anti-freeze-aids-snow-removal-operations
Asphalt anti-freeze aids snow removal operations

WinterPave asphalt anti-freeze is an anti-icing additive mixed with asphalt during production that helps prevent ice from adhering to the pavement, allowing for easier snow removal.

Asphalt anti-freeze aids snow removal operations
/proven-retaining-walls-roads-and-bridges
Proven retaining walls for roads and bridges

When engineers worldwide need a proven retaining wall solution for their road and bridge projects, they turn to Redi-Rock for engineered walls they trust. Watch this video to learn why.

 

For more information, click here.

Proven retaining walls for roads and bridges
/video-case-study-sealmaster-liquid-road-municipal-pavement-preservation-program-0
Liquid road treatment put to work in municipal pavement preservation program

Jasper, Ind., Street Commissioner and IACT 2014 Ivan H. Brinegar Municipal Management Award winner Raymie Eckerle discusses the performance of SealMaster’s Liquid Road in the city’s pavement preservation program.

Liquid road treatment put to work in municipal pavement preservation program
/permanent-pavement-repair-you-cant-afford-buy-cheap
Permanent pavement repair: You can't afford to buy cheap

Tired of filling the same potholes? Watch this video to learn about the six factors that go into creating a quality pavement repair material. If any of those factors are off, you will be refilling that same pothole again—soon.

Permanent pavement repair: You can't afford to buy cheap

Bridges View all 51 items

/video-kennedy-bridge-improvement-project
VIDEO: Kennedy Bridge improvement project

Workers with the Kentucky Transportation Cabinet (KYTC) are redoing the Kennedy Interchange where I-65, I-71 and I-64 all come together in downtown Louisville. The 52-year-old John F. Kennedy Memorial Bridge, which connects Kentucky to Indiana over the Ohio River, will carry six lanes of I-65 southbound traffic. Work on the bridge involves replacing the old deck and stringers.

 

VIDEO: Kennedy Bridge improvement project
/video-flint-river-bridge-birch-run-outlet-bridge-project
VIDEO: Flint River Bridge / Birch Run Outlet Bridge project

In Michigan’s Bay Region, the Michigan Department of Transportation has a unique project involving replacing two bridges at both the Flint River and the Birch Run Outlet, and building approximately 3,800 ft of new roadway. The new Flint River Bridge is 272 ft longer and 6 ft higher, while the bridge over the Birch Run Outlet is 15 ft longer and 7 ft higher than the existing bridges.

VIDEO: Flint River Bridge / Birch Run Outlet Bridge project
/video-i-290390-interchange-project-update
VIDEO: I-290/390 Interchange project update

The I-290 Interchange project and the Illinois Route 390 project are part of the Illinois Tollway's Elgin-O'Hare Western Access Project. Scheduled to be complete in 2017, the I-290 Interchange project will include 17 ramps and 15 new bridges in the interchange area, and will create direct access with free-flow traffic movements to and from Illinois Route 390 in all directions. 

VIDEO: I-290/390 Interchange project update
/video-udot-region-two-news-brief-july-2016
VIDEO: UDOT Region Two news brief - July 2016

The Utah Department of Transportation (UDOT) provides construction updates for the month of July, including project information on the Bargerter Highway 600 West Interchange, the Mountain View Corridor project in West Valley City, and the resurfacing of SR-210 (Wasatch Blvd.) between Big and Little Cottonwood canyons. 

VIDEO: UDOT Region Two news brief - July 2016
/video-sr-232-i-15-utah
VIDEO: S.R. 232 & I-15 Utah

This accelerated bridge construction project in Salt Lake City, Utah, made use of a slide-in-place technique to avoid traffic disruption—entirely.

VIDEO: S.R. 232 & I-15 Utah
/video-jane-byrne-interchange-construction-update-2016
VIDEO: Jane Byrne Interchange construction update 2016

The Jane Byrne Interchange in Chicago is the meeting place for the I-90 Kennedy Expressway, the I-290 Eisenhower, and the I-94 Dan Ryan. The northwest flyover project will allow traffic to flow unimpeded from the Dan Ryan to the city's outlying suburbs. The 2016 construction season is expected to be one of robust progress as crews press toward the goal of opening the flyover bridge to late fall traffic.

VIDEO: Jane Byrne Interchange construction update 2016
/video-people-mdot-%E2%80%93-bridge-inspector
VIDEO: People of MDOT – Bridge Inspector

Scott Kuntz has been working as a bridge inspector for almost seven years. He and his team are responsible for inspecting over 664 bridges in MDOT’s District 7. Scott’s number one objective during an inspection is to ensure that each bridge is safe for Mississippi’s residential and commercial commuters. The team checks a variety of aspects of the bridge structure to look for deficiencies and deterioration, assisting in the determination if repair is necessary.

VIDEO: People of MDOT – Bridge Inspector
/video-pigeon-roost-road-bridge-demolition
VIDEO: Pigeon Roost Road Bridge demolition

On June 6, 2014, Highway 78 was shut down at 8:30 p.m. in order for the Pigeon Roost Road Bridge in Mississippi to be demolished. Work progressed throughout the night and into the morning. At 7:30 a.m. on June 7, Highway 78 was reopened to traffic. The demolition of the bridge only took 11 hours.

VIDEO: Pigeon Roost Road Bridge demolition

Concrete View all 21 items

/video-i-290390-interchange-project-update
VIDEO: I-290/390 Interchange project update

The I-290 Interchange project and the Illinois Route 390 project are part of the Illinois Tollway's Elgin-O'Hare Western Access Project. Scheduled to be complete in 2017, the I-290 Interchange project will include 17 ramps and 15 new bridges in the interchange area, and will create direct access with free-flow traffic movements to and from Illinois Route 390 in all directions. 

VIDEO: I-290/390 Interchange project update
/video-udot-region-two-news-brief-july-2016
VIDEO: UDOT Region Two news brief - July 2016

The Utah Department of Transportation (UDOT) provides construction updates for the month of July, including project information on the Bargerter Highway 600 West Interchange, the Mountain View Corridor project in West Valley City, and the resurfacing of SR-210 (Wasatch Blvd.) between Big and Little Cottonwood canyons. 

VIDEO: UDOT Region Two news brief - July 2016
/video-jane-byrne-interchange-construction-update-2016
VIDEO: Jane Byrne Interchange construction update 2016

The Jane Byrne Interchange in Chicago is the meeting place for the I-90 Kennedy Expressway, the I-290 Eisenhower, and the I-94 Dan Ryan. The northwest flyover project will allow traffic to flow unimpeded from the Dan Ryan to the city's outlying suburbs. The 2016 construction season is expected to be one of robust progress as crews press toward the goal of opening the flyover bridge to late fall traffic.

VIDEO: Jane Byrne Interchange construction update 2016
/video-diberville-diverging-diamond-interchange
VIDEO: D'Iberville Diverging Diamond Interchange

With the recent economic boom felt throughout the City of D’Iberville comes an increase in traffic throughout the I-10 corridor. To help accommodate this growth, the Mississippi Department of Transportation (MDOT) has implemented Mississippi’s first Diverging Diamond Interchange (DDI). This new design is being implemented across the country as a safer and more cost-efficient alternative to traditional interchanges. 

VIDEO: D'Iberville Diverging Diamond Interchange
/proven-retaining-walls-roads-and-bridges
Proven retaining walls for roads and bridges

When engineers worldwide need a proven retaining wall solution for their road and bridge projects, they turn to Redi-Rock for engineered walls they trust. Watch this video to learn why.

 

For more information, click here.

Proven retaining walls for roads and bridges
/video-case-study-sealmaster-liquid-road-municipal-pavement-preservation-program-0
Liquid road treatment put to work in municipal pavement preservation program

Jasper, Ind., Street Commissioner and IACT 2014 Ivan H. Brinegar Municipal Management Award winner Raymie Eckerle discusses the performance of SealMaster’s Liquid Road in the city’s pavement preservation program.

Liquid road treatment put to work in municipal pavement preservation program
/low-permeability-cement-bridge-deck-overlays-repairs
Low permeability cement for bridge deck overlays & repairs

Rapid Set Low-P Cement Concrete opens up to traffic in one to three hours. Long-life durability in harsh freeze-thaw conditions.

Low permeability cement for bridge deck overlays & repairs
/pile-driving-solutions-damper
Pile Driving Solutions Damper

Pile Driving Solutions offers a way to reduce the damage put on cranes during pile driving and casein jobs with the introduction of the vibratory damper. The damper provides less wear and tear to the crane, extra protection to the crane arm, maximized safety while using a vibratory hammer and longer extraction time. This truly is an all-in-one product.

 

 

 

Pile Driving Solutions Damper

Earthmoving View all 7 items

/cleanup-after-harsh-weather-patterns-texas-puts-gradall-xl-4100-iv-versatility-work
Cleanup after harsh weather patterns in Texas puts Gradall XL 4100 IV versatility to work

Dramatic changes in Texas weather create a wide range of maintenance issues for the Texas DOT. Watch how Gradall excavators handle them.

Cleanup after harsh weather patterns in Texas puts Gradall XL 4100 IV versatility to work
/introducing-discovery-series-gradall-excavators
Introducing Discovery Series Gradall Excavators

Gradall Industries introduces this cost-effective solution for governments and contractors. Gradall’s Discovery Series excavators are the first crossover hydraulic excavators.

Introducing Discovery Series Gradall Excavators
/dedicated-unsung-heroes-you
Dedicated to unsung heroes... like you.

Kip Moore and CASE dedicate this song to the hard-working men and women who commit their lives to constructing the world where we live, work and play. Thank you for all you do.

Dedicated to unsung heroes... like you.
/acc-finds-success-hyundai-r235lcr-9-excavator-confined-highway-site
ACC Finds Success with a Hyundai R235LCR-9 Excavator on Confined Highway Site
ACC Finds Success with a Hyundai R235LCR-9 Excavator on Confined Highway Site
/hyundai-construction-equipment-conexpo-product-walkaround
Hyundai Construction Equipment ConExpo Product Walkaround
Hyundai Construction Equipment ConExpo Product Walkaround
/series-iv-mobility-head-head-test
Series IV Mobility: A Head-to-Head Test

Watch Gradall excavators with highway speed wheeled undercarriages, automatic transmissions and Series 4i engine and transfer cases go head-to-head with the Series III models.

Series IV Mobility: A Head-to-Head Test
/advantages-gradall-mobility
The advantages of Gradall mobility
The advantages of Gradall mobility

Maintenance View all 20 items

/road-bridge-repair-challenges-solved-concrete-cloth-gccm
Road & bridge repair challenges solved with Concrete Cloth GCCM

Learn how flexible, durable Concrete Cloth can help simplify complex, costly infrastructure challenges such as culvert rehabilitation, ditch lining, erosion control and more.

Road & bridge repair challenges solved with Concrete Cloth GCCM
/magma-cracksealers
Magma cracksealers

Simple, safe and reliable describes the new Magma cracksealers in safety green for 2016. Quietest operation, best operator visibility and new ergonomic wand.

Magma cracksealers
/asphalt-anti-freeze-aids-snow-removal-operations
Asphalt anti-freeze aids snow removal operations

WinterPave asphalt anti-freeze is an anti-icing additive mixed with asphalt during production that helps prevent ice from adhering to the pavement, allowing for easier snow removal.

Asphalt anti-freeze aids snow removal operations
/next-generation-brine-makers
The next generation of brine makers

The AccuBrine automated brine maker NXT-Gen now brings snowfighters even more advanced brine-making technology, greater accuracy and precision automation for better brine, every time.

The next generation of brine makers
/tc3-move
TC3: On the Move

Michigan DOT Director and AASHTO CEO Executive Sponsor Kirk Steudle explains what's new with the Transportation Curriculum Coordination Council (TC3).

TC3: On the Move
/tc3-informational-video
TC3 Informational Video

A state-based initiative recently adopted as a technical service program within AASHTO, the Transportation Curriculum Coordination Council (TC3)'s mission is to develop and maintain a quality training curriculum to enhance the competency of the nation's transportation construction, maintenance and materials technical workforce.

TC3 Informational Video
/great-brook-storm-damage-uas-video
Great Brook Storm Damage UAS Video

In late July major thunderstorms dropped half a foot of rain in a matter of hours over a small location in central Vermont. Streams quickly rose, moving woody debris downstream where it clogged culverts and bridges. The resulting floods caused substantial damage to both roads and bridges in two towns. By deploying UAS technology in the hours after the storm researchers were able to document the event and measure the damage using 3-D models created from the UAS imagery. Perhaps more importantly, they were able to conduct a detailed survey of the problematic streams and quantify the amount of woody debris that had moved during the storm and map the woody debris that would likely affect culverts and bridges in subsequent storms. 
 
This video appears courtesy of Jarlath O'Neil-Dunne, University of Vermont.

Great Brook Storm Damage UAS Video
/durapatcher-permanent-solution-potholes
DuraPatcher - A Permanent Solution for Potholes
DuraPatcher - A Permanent Solution for Potholes

Safety View all 19 items

/rehoboth-beach-sea-witch-festival-deploys-safetywall
Rehoboth Beach Sea Witch Festival deploys SafetyWall

PSS SafetyWall ADA-compliant Pedestrian Longitudinal Channelizer provides safe, continuous guidance for pedestrians, especially those with limited vision, through sidewalk work zones. 
 

SafetyWall also serves as guidance and channelizer for other applications, in addition to sidewalk work zones and closures. 
 

In this video, watch how the Rehoboth Beach Sea Witch Festival deployed SafetyWall to guide and protect parade watchers. 

 

Contact us for more information: 800.662.6338, or visit: www.PSS-Innovations.com

Rehoboth Beach Sea Witch Festival deploys SafetyWall
/pss-introduces-boardwalk-temporary-ramp
PSS Introduces BoardWalk Temporary Ramp

PSS designs, manufactures and markets innovative traffic safety devices. In this video, PSS introduces its latest innovation: the BoardWalk Temporary Pedestrian Modular Ramp. 

 

See BoardWalk at ATSSA Expo, Feb. 1-3, 2016 in New Orleans.

 

For a demonstration of BoardWalk in your sidewalk work zone, call PSS Customer Service at 800.662.6338

 

 

PSS Introduces BoardWalk Temporary Ramp
/re-introducing-lanegard-3-type-iii-barricade
(Re)-Introducing LaneGard 3 Type III Barricade

We're running this video again as a way to announce that we now have an FHWA Acceptance Letter, WZ-336, for LaneGard 3.

LaneGard 3 is a unique, one-piece Type III Barricade that folds for transport and storage, unfolds for quick deployment and use. Call us now for a demonstration at 800-662-6338.

 

(Re)-Introducing LaneGard 3 Type III Barricade
/introducing-crib-cargo-carrier-roadquake-2f-rumble-strips
Introducing CRIB Cargo Carrier for RoadQuake 2F Rumble Strips!

CRIB is a fully-integrated cargo carrier, designed specifically for the transport, deployment, retrieval, storage and safe-keeping of RoadQuake 2F Temporary Portable Rumble Strips (TPRS).

CRIB makes rumble strip deployment faster and safer for workers!

And, because of its ergonomic design, complete with a set of stainless steel rollers at each end, CRIB can reduce the potential for superficial stress to workers.

RoadQuake 2F TPRS can virtually roll in and out of CRIB. The stainless steel rollers do a lot of the "heavy lifting" workers formerly did.

Watch the video, then contact Plastic Safety Systems for a demo! Call 800-662-6338 or visit plasticsafety.com.

Introducing CRIB Cargo Carrier for RoadQuake 2F Rumble Strips!
/site-safe-tma-truck-sales-%E2%80%93-your-work-zone-site-safe
Site-Safe TMA Truck Sales – Is your work-zone Site-Safe?

Site-Safe Truck Sales provides sales and delivery of quality, contractor rugged and proven TMA Trucks throughout the U.S.

Site-Safe TMA Truck Sales – Is your work-zone Site-Safe?
/durable-glare-screen-and-safety-barrier
Durable Glare Screen and Safety Barrier
Durable Glare Screen and Safety Barrier
/mobility-pays-when-setting-barriers
Mobility Pays Off When Setting Barriers

A Gradall is used for highway barrier placement, eliminating the need for a lowboy trailer—and cranes and conventional excavators—while placing 50% more barriers a day.

Mobility Pays Off When Setting Barriers
/high-friction-surface-treatment
High Friction Surface Treatment

International Cybernetics Corp. has the technology to prevent fatalities and serious injuries from happening due to roadway departures or pavement conditions. An immediate solution is available today. 

High Friction Surface Treatment

Transportation Management View all 6 items

/video-ohio-river-bridges-project%E2%80%94traffic-and-safety-improvements
VIDEO: Ohio River Bridges project—traffic and safety improvements

Construction crews on the Ohio River Bridges Project Downtown Crossing are working to change the landscape of downtown Louisville, Ky., and southern Indiana. The addition of lanes and the reduction of conflict points on the project are helping to improve traffic flow and safety. 

VIDEO: Ohio River Bridges project—traffic and safety improvements
/video-jane-byrne-interchange-traffic-management-and-operations-update-2016
VIDEO: Jane Byrne Interchange traffic management and operations update 2016

The Jane Byrne Interchange is the confluence of I-90, I-290, and Congress Parkway. With more than 400,000 vehicles traveling through the interchange daily and more than 900 crashes annually, it rates as one of the worst bottlenecks in the country. Among the project's major challenges has been maintaining a comprehensive traffic management plan amidst persistently heavy traffic. 

VIDEO: Jane Byrne Interchange traffic management and operations update 2016
/m1-rail-project-construction
M1-Rail Project Construction

Roads & Bridges visited the M1-Rail project in Detroit, Mich., which is projected to be completed by late 2016. 

M1-Rail Project Construction
/lindsay-transportation-solutions-presents-road-zipper-construction-applications
Lindsay Transportation Solutions presents the Road Zipper for Construction Applications
Lindsay Transportation Solutions presents the Road Zipper for Construction Applications
/road-zipper-system-moving-peoplebetter
The Road Zipper System, Moving People...Better

This video shows The Road Zipper System in action on some of America’s busiest roadways, juxtaposed with shots of commuter life without the congestion mitigation and safety benefits that the system provides.

The Road Zipper System, Moving People...Better
/matahorua-gorge-bridge
Matahorua Gorge Bridge
Matahorua Gorge Bridge
Overlay Init