Sierra Madre, Calif., challenged with trying to replace an existing water storage tank with two new tanks while having only one piece of land available
The city of Sierra Madre, Calif., was recently challenged with trying to replace an existing water storage tank with two new tanks and having only one piece of land available for the site.
In order to achieve this goal, two ultimate goals had to be met. First, the project had to comply with the local health department’s preference for multiple reservoirs within each pressure zone—only one reservoir served Zone 2 at the time. Secondly, the one small piece of land available had to be used for constructing two reservoirs for the project where only one would fit.
In order for the city to deliver a precious resource and make efficient use of the land while answering both the needs of the community and the city, the solution was to build a 2.8 million-gallon water storage tank-within-a-tank.
To make this vision a reality, the city hired a project team comprised of RBF, consulting engineer; SSC Construction, Inc., general contractor; Bucknam and Associates, project manager; and DYK, Inc., the tank prestressor.
Project parameters
The Grove Street Reservoir Project involved the removal of
an existing reinforced concrete tank and the construction of a prestressed concrete tank with a concentric concrete inner wall. The site was extremely tight and completely surrounded by existing residential development. The maximum setback from the property line on any side of the reservoir was only 28 ft.
The Grove Street Reservoir was the only reservoir in the city’s Zone 2, serving approximately 33% of the city’s residents. The available land was the only space available for construction of a water storage tank.
Because the city did not have the option to build an additional reservoir within this Zone and the existing site could not support separate tanks, a concentric tank inside an outer tank concept was adopted. The tank-within-a-tank concept satisfied the Health Department’s preference for reservoir separation while accommodating two tanks on one site.
The outer walls of the water tank were both circumferentially and vertically prestressed by DYK, Inc. Meanwhile, vertical post-tensioning was achieved with 126, 13/8-in., diameter high-strength steel vertical tendons.
Circumferential prestressing was completed using 7-wire galvanized strand pulled to 14,950 lb and protected with several coats of automatically applied shotcrete.
The prestressing machine continuously and electronically monitored the applied stressing force on the strand as it was applied. By keeping the corewall in compression along with the independent connections, it ensures a long life water tight structure.
Another significant aspect of the tanks that make the reservoir unique is the concentric tanks are normally operated in tandem, with water levels raising and lowering in synchronization. However, the design of these two tanks allows for the tanks to be operated independently. Consequently, this provides each tank the ability to be drained for cleaning or inspection.
Innovative design and construction techniques were incorporated into the Grove Street Reservoir Reconstruction project to provide the community of Sierre Madre with safe and reliable water storage while ensuring efficient use of available land.
More like this
Roads&Bridges Videos
Industry News
Products
8322 Products
-
The ComNet FVT/FVRHDMI transmits a high-resolution HDMI signal over one multimode fiber up to 500 meters for the 1080p60 format. The FVT/...
-
RTMS (Remote Traffic Microwave Sensor) is a non-intrusive, radar-based detection system renowned for long-term, worry-free reliability and...
-
Volvo almost completely redesigned its B-Series of backhoe loaders, which includes the BL60B and BL70B. Among the changes is a new set of...
-
Maximizing productivity and efficiency is the key to the eight models in John Deere’s K Series of backhoe loaders, which also features a pair...
-
JCB has extended the reach, both literally and figuratively, of its ICX backhoe loader with longer loader arms (by 4 inches) and an extending dipper...
-
Allowing man and machine to work together more efficiently was the goal of the upgrades to Terex’s TLB 840 backhoe loader, starting with the...
-
The C Series from New Holland Construction offers the B95C LR (long reach) and the B95C TC (tool carrier). The LR is more compact with a longer stick...
-
Case’s N Series of loader backhoes — which includes the 580N, 580 Super N, 580 Super N Wide Track and 590 Super N — are driven by Tier 4-...
-
The Cat C4.4 engine on the three new models in the F Series — the 416F, 420F and 430F — upgrades power while staying up to Tier 4 Interim emissions...
-
Versatility is the name of the game with the L45 Tractor-Loader-Backhoe from Kubota, a 3-in-1 machine with a 45-hp Kubota diesel engine at its...