The Split required the removal of 60,800 sq yd of existing

asphalt and concrete pavements and 72,000 cu yd of excavation.

During the removal phase, an area of soft subgrade

was discovered in the southbound lanes between Fletcher

Avenue and Calvary Street bridges. Widening and lowering

the road called for the existing slopes to be re-cut to match

the new road grade. The slopes were much steeper than

anticipated, and the solution called for the use of rip-rap

to keep the slope in place.

Sponsored Recommendations

Concrete Protection That’s Easy on the Environment and Tough to Beat

PoreShield's concrete penetration capabilities go just as deep as our American roots. PoreShield is a plant-based, eco-friendly alternative to solvent-based concrete sealers.

Proven Concrete Protection That’s Safe & Sustainable

Real-life DOT field tests and university researchers have found that PoreShieldTM lasts for 10+ years and extends the life of concrete.

Revolutionizing Concrete Protection - A Sustainable Solution for Lasting Durability

The concrete at the Indiana State Fairgrounds & Event Center is subject to several potential sources of damage including livestock biowaste, food/beverage waste, and freeze/thaw...

The Future of Concrete Preservation

PoreShield is a cost-effective, nontoxic alternative to traditional concrete sealers. It works differently, absorbing deep into the concrete pores to block damage from salt ions...