Delivering a Hat Trick of Performance: Latex Modified Concrete Scores on the Gordie Howe International Bridge


February 4th, 2026
Time: 2:00 PM ET | 1:00 PM CT | 11:00 AM PT
Duration: 60 minutes
Already registered? Click here to login now.
Summary
The Gordie Howe International Bridge presented unique challenges requiring a durable, high-performance concrete overlay. This webinar explores how LMC met these demands, providing enhanced durability, flexibility, and resistance to chloride-ion penetration.
Attendees will gain insights into:
· Why a latex overlay was selected for this project, and how the latex modification enhances long-term durability while reducing maintenance needs.
· Mix design, field installation, quality control, and performance monitoring.
· The robustness of latex modified concrete under cold temperature applications.
· Key lessons on collaboration among designers, contractors, and material suppliers to achieve optimal results.
Discover how LMC is designed to extend the Gordie Howe Bridge’s service life and reduce long-term maintenance costs, highlighting the transformative potential of LMC in modern infrastructure.





