I-40 Meteor City Road Bridge Replacement outside Winslow, Arizona

This accelerated bridge build in the Arizona desert replaces a pair of structurally deficient spans originally built in the 1960s. Our thanks to the Arizona DOT for contributing this video. Enjoy!

October 29, 2019 / 0:02:48
November 07, 2019 / 0:01:39
expand_less