GEOWEB Unpaved Road: Alabama Power Company

March 10, 2020
GEOWEB sections are fast to deploy and install through wetland areas.
GEOWEB sections are fast to deploy and install through wetland areas.

Protecting Wetlands

The Alabama Power Company (APC) planned a second substation to provide an alternative power source to Providence Hospital in Mobile, Alabama. However, wetlands adjacent to the project site impacted the plans as construction of an access road to install the substation and power line raised environmental concerns with officials and citizens. The US Army Corps of Engineers (ACOE) also sought to minimize wetland disturbance and had strict requirements for limiting impervious area.

Pervious Road Solution

The head of APC’s storm water environmental compliance, Pamela McDaniel, developed a plan that addressed concerns and complied with regulatory limitations. Because the wetlands could not be impacted without building a storm water retention area along the right-of-way to retain the runoff, McDaniel instead suggested the Presto GEOWEB® roadway system to stabilize aggregate for a “permeable” access road in the upland portion of the project. Unlike hard surface pavements that are impervious, the GEOWEB system infiltrates water at a high rate, allowing stormwater to drain naturally into the soil. The city of Mobile accepted this solution, waiving its requirement for a retention pond at this site.

Low-Impact Installation

The routing of the power line from the substation to the hospital stretched electric cable through a forested wetland on the south side of Providence Hospital. McDaniel noted that to ensure the wetland was not disrupted by large machinery, workers cut out the foliage in the area by hand as well as hauled debris away via helicopter.  

GEOWEB sections filled with aggregate to allow access and permeability.
GEOWEB sections filled with aggregate to allow access and permeability.

The Results

The new substation provided Providence Hospital with two sources of power to assure uninterrupted power in the event of failure at one. By working together and utilizing the GEOWEB Soil Stabilization System, APC and the city of Mobile were able to accomplish the following project goals:

  • Allow access with a permeable roadway that infiltrates stormwater runoff
  • Minimize disturbance of the sensitive wetlands area
  • Adhere to the city’s and the ACOE’s requirements

“We are pleased this project was possible because of the GEOWEB system manufactured by Presto Geosystems. Patients and their doctors at the hospital will be confident power will not be disrupted just when it is most needed. This was a great service to the Mobile, Alabama area.” noted  material supplier Skip Ragsdale, Sunshine Supplies, Birmingham, Alabama.

 

Editor's Note: Scranton Gillette Communications and the SGC Infrastructure Group are not liable for the accuracy, efficacy and validity of the claims made in this piece. The views expressed in this content do not reflect the position of the Roads & Bridges' Editorial Team.

Related Articles

Construction projects in dense urban or suburban areas are among the most crucial to our national infrastructure, yet they also tend to be the least…
March 02, 2017
Large church, huge operation made SH 74 challenging
Large church, huge operation made SH 74 challenging
They attended to the church regularly. Old State Highway (SH) 74 in Oklahoma City had been servicing cars for about a century, and the two-lane road…
March 02, 2017
expand_less