Case Studies

Learn how recent infrastructure projects improved safety, increased efficiencies, trimmed costs and implemented new technologies.

vacuworx CM 3 Compact Modular Vacuum Lifting System
Miller Pipeline used the Vacuworx CM 3 Vacuum Lifting System to handle the daily moving of 40 steel plates required to cover areas potholed during an infrastructure replacement project in California.
ClearCast Forms are transparent stay-in-place deck forms that improve safety, speed deck placement, eliminate form stripping, and allow inspections during and after the deck pour.
ClearCast Forms are transparent stay-in-place deck forms that improve safety, speed deck placement, eliminate form stripping, and allow inspections during and after the deck pour. Photo courtesy of Devin Ferguson, Brownstone Marketing
GEOWEB sections are fast to deploy and install through wetland areas.
GEOWEB sections are fast to deploy and install through wetland areas.
The Octapad, with a lifting capacity of 11,888 lb, includes eight flat pads with individual vacuum valves that can be shut off when directly over a crack, pothole or area of the slab that is too damaged for lifting.
The Octapad, with a lifting capacity of 11,888 lb, includes eight flat pads with individual vacuum valves that can be shut off when directly over a crack, pothole or area of the slab that is too damaged for lifting.