2010 Top 10 Roads - No. 10

Oct. 1, 2011
I-15 WIDENING
PROJECT: I-15 Widening
LOCATION: Salt Lake City, Utah
COST: $115 million
LENGTH: 4.1 miles
DESIGNER: Parsons Transportation Group
CONTRACTORS: Kiewit Western Co./W.W. Clyde & Co.
OWNER: Utah DOT

This project consisted of widening the mainline highway with an express lane and three general-purpose lanes. Three bridges also were replaced, calling for the longest prestressed concrete girders set in the U.S. at 197 ft in length. Several structural innovations were used, including the tip-grouting of drilled shafts to increase vertical capacity. The I-15 bridge over Beck Street is the first UDOT operational seismic bridge design.

Sponsored Recommendations

The Science Behind Sustainable Concrete Sealing Solutions

Extend the lifespan and durability of any concrete. PoreShield is a USDA BioPreferred product and is approved for residential, commercial, and industrial use. It works great above...

Powerful Concrete Protection For ANY Application

PoreShield protects concrete surfaces from water, deicing salts, oil and grease stains, and weather extremes. It's just as effective on major interstates as it is on backyard ...

Concrete Protection That’s Easy on the Environment and Tough to Beat

PoreShield's concrete penetration capabilities go just as deep as our American roots. PoreShield is a plant-based, eco-friendly alternative to solvent-based concrete sealers.

Proven Concrete Protection That’s Safe & Sustainable

Real-life DOT field tests and university researchers have found that PoreShieldTM lasts for 10+ years and extends the life of concrete.