Bridges

Pigeon Roost Road Bridge demolition

On June 6, 2014, Highway 78 was shut down at 8:30 p.m. in order for the Pigeon Roost Road Bridge in Mississippi to be demolished. Work progressed throughout the night and into the morning. At 7:30 a.m. on June 7, Highway 78 was reopened to traffic. The demolition of the bridge only took 11 hours.

Bridges

/video-flint-river-bridge-birch-run-outlet-bridge-project
VIDEO: Flint River Bridge / Birch Run Outlet Bridge project

In Michigan’s Bay Region, the Michigan Department of Transportation has a unique project involving replacing two bridges at both the Flint River and the Birch Run Outlet, and building approximately 3,800 ft of new roadway. The new Flint River Bridge is 272 ft longer and 6 ft higher, while the bridge over the Birch Run Outlet is 15 ft longer and 7 ft higher than the existing bridges.

VIDEO: Flint River Bridge / Birch Run Outlet Bridge project
/video-i-290390-interchange-project-update
VIDEO: I-290/390 Interchange project update

The I-290 Interchange project and the Illinois Route 390 project are part of the Illinois Tollway's Elgin-O'Hare Western Access Project. Scheduled to be complete in 2017, the I-290 Interchange project will include 17 ramps and 15 new bridges in the interchange area, and will create direct access with free-flow traffic movements to and from Illinois Route 390 in all directions. 

VIDEO: I-290/390 Interchange project update
/video-udot-region-two-news-brief-july-2016
VIDEO: UDOT Region Two news brief - July 2016

The Utah Department of Transportation (UDOT) provides construction updates for the month of July, including project information on the Bargerter Highway 600 West Interchange, the Mountain View Corridor project in West Valley City, and the resurfacing of SR-210 (Wasatch Blvd.) between Big and Little Cottonwood canyons. 

VIDEO: UDOT Region Two news brief - July 2016
/video-sr-232-i-15-utah
VIDEO: S.R. 232 & I-15 Utah

This accelerated bridge construction project in Salt Lake City, Utah, made use of a slide-in-place technique to avoid traffic disruption—entirely.

VIDEO: S.R. 232 & I-15 Utah
/video-jane-byrne-interchange-construction-update-2016
VIDEO: Jane Byrne Interchange construction update 2016

The Jane Byrne Interchange in Chicago is the meeting place for the I-90 Kennedy Expressway, the I-290 Eisenhower, and the I-94 Dan Ryan. The northwest flyover project will allow traffic to flow unimpeded from the Dan Ryan to the city's outlying suburbs. The 2016 construction season is expected to be one of robust progress as crews press toward the goal of opening the flyover bridge to late fall traffic.

VIDEO: Jane Byrne Interchange construction update 2016
/video-people-mdot-%E2%80%93-bridge-inspector
VIDEO: People of MDOT – Bridge Inspector

Scott Kuntz has been working as a bridge inspector for almost seven years. He and his team are responsible for inspecting over 664 bridges in MDOT’s District 7. Scott’s number one objective during an inspection is to ensure that each bridge is safe for Mississippi’s residential and commercial commuters. The team checks a variety of aspects of the bridge structure to look for deficiencies and deterioration, assisting in the determination if repair is necessary.

VIDEO: People of MDOT – Bridge Inspector
/pigeon-roost-road-bridge-demolition
Pigeon Roost Road Bridge demolition

On June 6, 2014, Highway 78 was shut down at 8:30 p.m. in order for the Pigeon Roost Road Bridge in Mississippi to be demolished. Work progressed throughout the night and into the morning. At 7:30 a.m. on June 7, Highway 78 was reopened to traffic. The demolition of the bridge only took 11 hours.

Pigeon Roost Road Bridge demolition
/new-mexico-mabey-bridge
New Mexico Mabey Bridge

The prefabricated Mabey Bridge in Trementina, N.M. spans an 80-ft section of arroyo, which floods out during the summer and is covered with snow in winter, making travel difficult for motorists in the region. Since the six-month bridge installation project was completed, however, the community has been able to safely travel in this area. 

New Mexico Mabey Bridge
/video-stowe-vt-accelerated-bridge-project
VIDEO: Stowe, VT accelerated bridge project

Replacement of the Mountain Road bridge in Stowe was delayed for decades because of the impact it would have on Stowe’s economy. Utilizing Accelerated Bridge Construction methods, VTrans was able to close the road and replace the bridge in a matter of weeks. 

VIDEO: Stowe, VT accelerated bridge project
/video-hartford-vt-lateral-slide
VIDEO: Hartford, VT lateral slide

The I-91 bridges over Route 5 in Hartford were fracture critical and due for replacement. To minimize impacts to interstate traffic, the bridge slides took place over just two weekends, as part of the VTrans Accelerated Bridge Program.

VIDEO: Hartford, VT lateral slide
/brookfield-floating-bridge-part-2-new-bridge
Brookfield Floating Bridge, Part 2: The New Bridge

In 2015, the Vermont Agency of Transportation completed construction on the eighth rebuild of the historic floating bridge in the town of Brookfield. The rebuild of the Brookfield floating bridge was designed to withstand a variety of forces and to last much longer.

Brookfield Floating Bridge, Part 2: The New Bridge
/brookfield-floating-bridge-part-1-history
Brookfield Floating Bridge, Part 1: History

In 2015, the Vermont Agency of Transportation completed construction on the eighth rebuild of the historic floating bridge in the town of Brookfield. 

Brookfield Floating Bridge, Part 1: History
/proven-retaining-walls-roads-and-bridges
Proven retaining walls for roads and bridges

When engineers worldwide need a proven retaining wall solution for their road and bridge projects, they turn to Redi-Rock for engineered walls they trust. Watch this video to learn why.

 

For more information, click here.

Proven retaining walls for roads and bridges
/i-280-bridge-hinge-removal-replacement
I-280 bridge hinge removal & replacement

Northbound lanes of the freeway between downtown San Francisco and Highway 101 reopens more than seven hours ahead of schedule.

I-280 bridge hinge removal & replacement
/mabey-towers-support-bridge-repairs
Mabey towers support bridge repairs

Mabey Inc. supplied towers to support a bridge while repairs were made to leaning piers. The bridge remained open to traffic for a majority of the 11-month project.

Mabey towers support bridge repairs
/propping-and-jacking-system-bridge-repairs
Propping and jacking system for bridge repairs

Pier work commences with Mabey's MAT75/125 propping and hydraulic jacking system support bridge.

Propping and jacking system for bridge repairs
/watch-animation-panel-bridge-build
Watch animation of panel bridge build

Mabey’s compact bridge is built in sections, like an erector set, and pushed out into the abyss, a section at a time, until it reaches the opposing shore.

Watch animation of panel bridge build
/san-francisco%E2%80%93oakland-bay-bridge-0
San Francisco–Oakland Bay Bridge

Witness more than 42,000 hours of construction in 4 minutes with the official San Francisco-Oakland Bay Bridge time-lapse. EarthCam's HD construction cameras shot progress from 2008-13, archiving nearly 2 million images of the $6.4 billion bridge.

San Francisco–Oakland Bay Bridge
/i-91-brattleboro-bridge
I-91 Brattleboro Bridge

A new span of the I-91 Brattleboro Bridge in Brattleboro, Vermont, replaces structurally deficient and functionally obsolete twin steel truss bridges that were built in 1958. 

I-91 Brattleboro Bridge
/over-top-ingenuity-rebuilding-america
Over The Top: Ingenuity for Rebuilding America

Modjeski and Masters kept rail, marine and highway traffic moving in a busy Virginia shipping corridor by designing a 5 million pound lift span that was built offsite and floated it into position on a giant barge. This short video offers fascinating behind the scenes insight from designer, owner, contractor and stakeholder perspectives.
www.modjeski.com
 

Over The Top: Ingenuity for Rebuilding America
/stearns-road-bridge
Stearns Road Bridge
Stearns Road Bridge
/fort-worth-texas-bridge-moved-place
Fort Worth, Texas, bridge moved into place
Fort Worth, Texas, bridge moved into place
/arterial-expansion-completed-10-months-ahead-schedule
Arterial Expansion Completed 10 Months Ahead of Schedule
Arterial Expansion Completed 10 Months Ahead of Schedule
/innerbelt-bridge-project
Innerbelt Bridge Project
Innerbelt Bridge Project
/san-francisco%E2%80%93oakland-bay-bridge
San Francisco–Oakland Bay Bridge
San Francisco–Oakland Bay Bridge
/matahorua-gorge-bridge
Matahorua Gorge Bridge
Matahorua Gorge Bridge
/kicking-horse-canyon
Kicking Horse Canyon
Kicking Horse Canyon
/sealate-concrete-bridge-deck-healersealer
Sealate Concrete Bridge Deck Healer/Sealer
Sealate Concrete Bridge Deck Healer/Sealer
/new-jersey-dot-bridge-overlay
New Jersey DOT Bridge Overlay
New Jersey DOT Bridge Overlay
/emergency-repair-mathews-bridge
Emergency Repair on the Mathews Bridge
Emergency Repair on the Mathews Bridge
/us-bridge-cambridge-truss-installation-temecula-calif
U.S. Bridge Cambridge Truss Installation in Temecula, Calif.

Time-lapse video of the deconstruction of an existing bridge and the construction of a new U.S. Bridge Cambridge-style truss bridge in Temecula, Calif.

U.S. Bridge Cambridge Truss Installation in Temecula, Calif.
/pearl-harbor-memorial-bridge
Pearl Harbor Memorial Bridge
Pearl Harbor Memorial Bridge
/ben-sawyer-bridge
Ben Sawyer Bridge
Ben Sawyer Bridge
/bridge-hyperbuild
Bridge Hyperbuild
Bridge Hyperbuild
/amelia-earhart-memorial-bridge-time-lapse
Amelia Earhart Memorial Bridge Time-Lapse
Amelia Earhart Memorial Bridge Time-Lapse
/take-new-look-precast
Take a New Look at Precast
Take a New Look at Precast
/rapid-bridge-build
Rapid Bridge Build
Rapid Bridge Build
/new-mississippi-river-bridge-project
The New Mississippi River Bridge Project
The New Mississippi River Bridge Project
/jerrold-avenue-bridge-replacement-san-francisco
Jerrold Avenue Bridge Replacement, San Francisco
Jerrold Avenue Bridge Replacement, San Francisco
/i-4-connector-project-tampa
I-4 Connector Project, Tampa
I-4 Connector Project, Tampa
Overlay Init