Power screen

May 25, 2005

The chieftain 1800 dry screen from powerscreen, Louisville, Ky., can process up to 500 tons per hour, depending on mesh size and material type and features a 16- x 5-ft triple deck screen unit mounted on 12 springs. The unit has an aggressive 10-mm throw. The oversize chute is hardox lined. The highly mobile unit typically sets up in 15 minutes. Available on tracked or wheeled chassis.

The chieftain 1800 dry screen from powerscreen, Louisville, Ky., can process up to 500 tons per hour, depending on mesh size and material type and features a 16- x 5-ft triple deck screen unit mounted on 12 springs. The unit has an aggressive 10-mm throw. The oversize chute is hardox lined. The highly mobile unit typically sets up in 15 minutes. Available on tracked or wheeled chassis.

Related Content