No. 6 - I-15, "The Point"

Oct. 5, 2016

What Utahans know as “The Point” is more or less the only significant route into and out of the Salt Lake Valley region and is thus perhaps the most crucial corridor in the entire state. Bookended by mountains on either side, the I-15 widening and rehabilitation project expands this 7-mile stretch to six lanes in each direction from S.R. 92 to 12300 South and replaces all existing pavement. With 160,000 ADT, The Point’s facelift was long overdue, and congestion is expected to be sizably reduced. “It’s crazy congested—at least it was,” said project manager Tim Rose. “Now that we’re nearly done, it’s pretty free-flowing.”

Location: Northern Utah County and Draper, Utah

Cost: $252 million

Length: 7 miles

Designer: Utah Department of Transportation

Contractor: Utah County Constructors 

Owner: Utah Department of Transportation

Sponsored Recommendations

The Science Behind Sustainable Concrete Sealing Solutions

Extend the lifespan and durability of any concrete. PoreShield is a USDA BioPreferred product and is approved for residential, commercial, and industrial use. It works great above...

Powerful Concrete Protection For ANY Application

PoreShield protects concrete surfaces from water, deicing salts, oil and grease stains, and weather extremes. It's just as effective on major interstates as it is on backyard ...

Concrete Protection That’s Easy on the Environment and Tough to Beat

PoreShield's concrete penetration capabilities go just as deep as our American roots. PoreShield is a plant-based, eco-friendly alternative to solvent-based concrete sealers.

Proven Concrete Protection That’s Safe & Sustainable

Real-life DOT field tests and university researchers have found that PoreShieldTM lasts for 10+ years and extends the life of concrete.