Home
Subscriptions
Events Calendar
Newsletter
Contact Us
Search:
ARCHIVES
News
Articles
Case Histories
White Papers
REFERENCES
Buyer's Guide
SERVICES
Career Center
SPOTLIGHTS
August 2010
Industry Links
July 2010
June 2010
TM&E July Spotlight
ZONES
Asphalt Roads
Bridges
Concrete Roads
Safety
Software
Traffic Management
CURRENT ISSUE
Click
here
for a subscription to
Roads & Bridges
Give us your feedback on our site.
Change your subscription info
Subscribe to our
Executive News Summary e-Newsletter.
Recycling Projects Nomination
RECYCLING PROJECTS NOMINATION 2011
Project Name:
*
Location:
*
Project Cost ($US):
Project Length (feet):
% RAP Used:
Milling depth of cut (inches)
Cost savings by recycling ($):
Recycling Type:
Cold In-Place
Hot In-Place
Full Depth Reclamation
Cold Planing
Designer/Design Firm:
*
Owner:
*
Contractors involved:
*
Start Date:
Finish Date:
Project challenges:
What equipment did you use in the project?
Manufacturer:
Specific piece of Equipment:
Manufacturer:
Specific piece of Equipment:
Manufacturer:
Specific piece of Equipment:
Manufacturer:
Specific piece of Equipment:
Manufacturer:
Specific piece of Equipment:
Manufacturer:
Specific piece of Equipment:
Manufacturer:
Specific piece of Equipment:
Manufacturer:
Specific piece of Equipment:
Manufacturer:
Specific piece of Equipment:
Manufacturer:
Specific piece of Equipment:
Project manager:
Name:
Company:
Phone Number:
Email Address:
Your contact information:
Name:
*
Company:
*
Phone Number:
*
Email Address:
*
Award Address (where should we send your prize if you win?):
Address:
*
State:
*
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
District of Columbia
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Kentucky
Louisiana
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Montana
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Oregon
Pennsylvania
Rhode Island
South Carolina
South Dakota
Tennessee
Texas
Utah
Vermont
Virginia
Washington
Washington D.C.
West Virginia
Wisconsin
Wyoming
City:
*
Zip/Postal Code:
*
Security Verification:
*
Please enter the letters you see to the left.
* Name specific phase or entire project
** All projects must be in the design/construction phase over the last 18 months
Previous winners of the Recycling awards are listed below and will not be eligible for this year's list.
Recycling 2010:
Category: Cold In-Place
Winner: US 2 Jct. SR 211 to Newport, Pend Oreille County, Northeast Washington State
Category: Cold Planing
Winner: 2009 PM-10 Alley & Shoulder Millings Project, Chandler, Ariz.
Category: Full-Depth Reclamation (FDR)
Winner: S.H. 6 Corridor Project No. 4 and No. 5, Falls County, Texas
Category: Hot In-Place (HIR)
Winner: Fraser Lake HIR Project, Central Britsh Columbia, Canada
Category: Hot In-Place (HIR)
Winner: SH 150 to Great Sand Dunes National Park
Recycling 2009:
Category: Cold In-Place
Winner: Delhi and Willard Residential Neighborhood Improvements
Category: Hot In-Place
Winner: 2008 Hot In-Place Recycling/Boiler Slag Seal
Category: Full-Depth Reclamation Winner
Winner: Eastbound Jane Addams Memorial Tollway (I-90/I-39) Widening and Reconstruction
Recycling 2008:
Category: Cold In-Place
Winner: Highway 4 in Mason County, Ill.
Category: Cold In-Place
Winner: I-80 at Pequop Summit in Nevada
Category: Hot In-Place
Winner: Design-Build in Juarez, Chihuahua, Mexico
Category: Full-Depth Reclamation
Winner: Dirt roadway paving project in Fairfield County, S.C.
QUICK LINKS:
Home
|
Advertising
|
News Search
|
Articles
|
Buyer's Guide
|
Career Center
|
Case Histories
|
Top of Page
© 2010 Scranton Gillette Communications, Inc.
All rights reserved.
www.scrantongillette.com
3030 W. Salt Creek Lane, Suite 201
Arlington Heights, Illinois 60005-5025 USA
P: 847-391-1000 | F: 847-390-0408
Site developed by:
Scranton Gillette Interactive Media
Webmaster
|
Privacy
|
Terms & Conditions