Printer-friendly versionSend to friend
Monday, February 22, 2010 - 09:07
Ill. towns want to amend I-355 deal for interchanges

Economy has soured, and towns find it difficult to make payments

Four towns that agreed to cover the $20 million cost of building interchanges to the southern extension of I-355 are now negotiating with the Illinois State Toll Highway Authority to add a payment schedule to the agreement, the Chicago Tribune reported.

Homer Glen, Lemont, Lockport and New Lenox agreed to pay for interchanges to their municipalities in the bright economy of 2006. Since then, the economy has gone dark. The interchanges have not yet brought the level of economic increase town leaders were anticipating.

“This is an agreement we want to honor,” Homer Glen Village Manager Paul Wallrich told the Chicago Tribune.

The I-355 extension opened in 2007. So far, each of the four municipalities has paid only $100,000 to the tollway authority. Will County, which also signed an agreement with the tollway authority for an interchange to the interstate, has started making payments of $214,285 in 2008 and again in 2009.

The four towns could face a 4.8% interest rate on any cash debt not paid by 2014.

“Building permits have taken a vacation,” New Lenox Village Administrator Russ Loebe, told the Chicago Tribune. “Commercial development today is barely in the ‘idle’ mode. Revenue is tight for us.

“We believe, in our heart of hearts, this is a great destination,” Loebe added. “By the time the economy gets its legs back up, we will see development ramp up quickly.”

Chicago Tribune

Roads&Bridges Videos

 

Products

  • Husqvarna’s FS 9900 D 3-speed gearbox flat saw works for jobs that require deep cutting or high production rates. Its fifth wheel option helps raise...
  • The new John Deere 9RT Scraper Special Series Tractors provides improved productivity, increased uptime and lower operating costs. This new series,...
  • The U.S. Environmental Protection Agency (EPA) recently designated the ClearLane enhanced deicer with a Design for the Environment label. In the new...
  • Lindsay Transportations Solutions added the TAU-II-R system to their lineup of road safety devices. Utilizing reusable elements, the system will...
  • Plastic Safety Systems Inc. recently introduced RoadQuake 2, its newest temporary portable rumble strip. Suitable in even sub-freezing temperatures...
  • Build tall, reinforced retaining walls with 100% positive connections using the Redi-Rock Positive Connection (PC) System. Incomparable structural...
  • Color-Safe Surface is an acrylic-based material used for pavement markings. It is typically used for bicycle and bus lanes, pedestrian areas,...
  • BOMAG’s BW 900-50 is the company’s latest generation 1-1.5 ton ride-on roller. Offering a working width of 35.4 in. and Honda’s GX630 gas engine, the...
  • American Highway’s Inclined Pivoted Turnbuckle Manhole Riser allows the user to not only raise the lid, but also tilt the lid to match the new road...
  • The Schwing S 43 SX concrete pump combines the best features of two boom types: Roll and Fold and Z. By putting the 270º Z-fold at the tip section,...