I-580 Bridge, Reno, Nev.

Nov. 1, 2005

This 1,722-ft concrete arch bridge is being built on the side of a hill and a temporary bridge has been built to access the north side of the project. The span is located at an elevation of 5,000 ft at the base of the Carson Range. Total cost: $43 million.

This 1,722-ft concrete arch bridge is being built on the side of a hill and a temporary bridge has been built to access the north side of the project. The span is located at an elevation of 5,000 ft at the base of the Carson Range. Total cost: $43 million.