Thursday, February 21, 2013 - 10:32

Elizabeth River Tunnels Project, Norfolk and Portsmouth, Va

Archived Webinar

 

Originally broadcast on: May 10, 2013 at 2:00 - 3:00pm eastern

 

To register and view this event on-demand, click Here

 

Webinar Overview:

Elizabeth River Crossings is building the Elizabeth River Tunnels Project in conjunction with the Virginia Department of Transportation, working to bring an efficient, linked transportation network for the Hampton Roads area.

The project includes a new two-lane tunnel under the Elizabeth River adjacent to the existing Midtown Tunnel; extending the MLK from London Boulevard to I-264, with an interchange at High Street; maintenance and safety improvements to the existing Midtown Tunnel; and maintenance and safety improvements to the existing Downtown Tunnel.

Participants earn One Professional Development Hour (PDH)

 

Presenter:

Frank Fabian joined the Virginia Department of Transportation (VDOT) as a Senior Project Manager in May 2010, bringing over 30 years of experience in design/ engineering and construction management to the project management team for the Hampton Roads District. Previous infrastructure project experience includes; transportation, power generation, water and sewer and industrial manufacturing.

He is currently managing the Hampton Roads District Special Projects Office that is charged with overseeing large transportation projects within the District, including the Elizabeth Rivers Tunnel Project (ERT) and the US 460 Project. Since the execution of the Comprehensive Agreement of both projects, Frank will be responsible for managing and delivering these projects to VDOT and the public. Both initiatives bring over $3.6 Billion in Transportation Infrastructure.

Mr. Fabian earned his BSCE at the Rochester Institute of Technology in 1981. In pursuing his graduate degree, he received an MBA from St. Bonaventure University in Management and Marketing. He is a registered Professional Engineer in Virginia and West Virginia and holds a General Contractor’s license in Construction Management.

Mr. Fabian has developed a passion for being involved with transportation solutions and views the ERT project as a “first step” project in a series of projects that will ultimately improve and enhance the mobility of the Tidewater Area of Virginia.

 

To register and view this event on-demand, click Here

Roads&Bridges Videos

 

Videos

Products

  • Plastic Safety Systems Inc. designed RoadQuake 2 Temporary Portable Rumble Strip to reduce accidents and save lives. RoadQuake 2, a...
  • The 26,455-lb (12,000-kg) HR120C-9 roller has a drum width of 6 ft 10 in. (2,100 mm), a drum diameter of 4 ft 11 in. (1,500 mm) and a drum thickness...
  • Animation of a U.S. Bridge Liberty Panel Bridge being assembled and launched. The animated video shows the various steps of assembling this panel...
  • Calbrite’s stainless steel EMT and EMT elbows are now UL/CUL approved. This recent addition to UL/CUL 797A offers Calbrite’s customers a cost-...
  • International Cybernetics’ portable road profiler gives accurate real-time smoothness results. The system can mount to any vehicle and will collect...
  • DuraHook allows municipalities to get higher utilization from truck chassis by rolling on and off in minutes. The DuraHook is self-contained with a 6...
  • SAFENCE High-Tension Cable Barrier from Gregory is a NCHRP 350 TL-3 and TL-4 approved tensioned wire rope cable barrier system. SAFENCE provides...
  • Outokumpu offers stainless steel reinforcement bar in duplex LDX 2101, 2304, and 2205 in both metric and imperial sizes––all produced to ASTM 955...
  • BOMAG’s Tangential Oscillation Compaction is optimized to target bridge structures, building proximity and intermediate/finish rolling applications....
  • Viewpoint V6 Software is a fully scalable and integrated SQL/.NET solution tailored specifically for mid-to-large-sized construction companies. An...