For those of us who started our working career with a desk calendar and a Rolodex, the computer age brought almost unimaginable information-management capabilities and convenience. In the construction industry, these renovations have proven especially useful. Interconnecting Blackberries, desktop computers and remote-access laptop computers have unleashed significant benefits, including enhanced and inexpensive internal and external communication. However, as with every technical advance there is some related pitfall or risk.
Hit the Save button
Contractors should be mindful that e-mail and other electronic data and information must be preserved when it relates to reasonably foreseeable civil or criminal litigation (whether involved as a litigant or a third party) or a governmental agency investigation (for example, an investigation by OSHA, the Justice Department or a state attorney general).
Once the duty to preserve information arises, corporate management must take affirmative steps to preserve relevant electronic data that they know, or should within reason know, are relevant or might lead to the discovery of admissible evidence. The duty to preserve material evidence arises not only during litigation but also extends to that period before the litigation when a party reasonably should know that the evidence may be relevant to anticipated litigation. The willful destruction of evidence or the failure to preserve potential evidence in a pending or future litigation is called “spoliation” by the courts.
Courts are increasingly inclined to hold corporations accountable for spoliation. The punishment handed down for spoliation can be severe. In 2004, a federal judge punished a company for deleting relevant e-mails by deciding to instruct the jury during the trial that the contents of the e-mails would have been favorable to the party deprived of them. In addition, failure to properly manage electronic documents can produce increased litigation costs, regulatory penalties and court-imposed sanctions. A corporation will not be excused from the duty to preserve electronic evidence merely because of its size or the attendant expense or complexity of compliance.
Every company should consider how it will discharge its preservation duties before the occasion arises. Written policies and procedures should be prepared, which are practical and reasonable. There is no one-size-fits-all approach that will satisfy the needs of every company. The president of a small construction firm with a single computer network and a few employees may well develop a simple yet highly effective document-management policy that would be wholly inappropriate for a larger contractor. Unless some legal duty requires an organization to keep electronic information, the systematic destruction of electronic information is perfectly fine and defensible. The key is to know when it is necessary to retain all information and to take the appropriate measures to retain it.
A document retention and preservation policy should outline the steps that will be undertaken when a duty to preserve electronic information arises. At a minimum, this policy involves notifying all employees likely to possess relevant information to preserve such information. At the same time, employees must be instructed to cease the deletion or destruction of any relevant electronic records. This is sometimes referred to as a “litigation hold.” Management must communicate a litigation hold clearly, forcefully and promptly, and the company should document its efforts. Thorough and effective planning can minimize and manage these risks, whereas waiting until the situation arises to take action will likely lead to the costly destruction of records.
More like this
Roads&Bridges Videos
Industry News
Products
1684 Products
-
The ComNet FVT/FVRHDMI transmits a high-resolution HDMI signal over one multimode fiber up to 500 meters for the 1080p60 format. The FVT/...
-
RTMS (Remote Traffic Microwave Sensor) is a non-intrusive, radar-based detection system renowned for long-term, worry-free reliability and...
-
Volvo almost completely redesigned its B-Series of backhoe loaders, which includes the BL60B and BL70B. Among the changes is a new set of...
-
Maximizing productivity and efficiency is the key to the eight models in John Deere’s K Series of backhoe loaders, which also features a pair...
-
JCB has extended the reach, both literally and figuratively, of its ICX backhoe loader with longer loader arms (by 4 inches) and an extending dipper...
-
Allowing man and machine to work together more efficiently was the goal of the upgrades to Terex’s TLB 840 backhoe loader, starting with the...
-
The C Series from New Holland Construction offers the B95C LR (long reach) and the B95C TC (tool carrier). The LR is more compact with a longer stick...
-
Case’s N Series of loader backhoes — which includes the 580N, 580 Super N, 580 Super N Wide Track and 590 Super N — are driven by Tier 4-...
-
The Cat C4.4 engine on the three new models in the F Series — the 416F, 420F and 430F — upgrades power while staying up to Tier 4 Interim emissions...
-
Versatility is the name of the game with the L45 Tractor-Loader-Backhoe from Kubota, a 3-in-1 machine with a 45-hp Kubota diesel engine at its...









