Concrete Fiber Reinforcement

The Bear Cut and West Bridges
Case Studies March 07, 2019
The Bear Cut Bridge and West Bridges is part of the Rickenbacker Causeway that connects Key Biscayne and Miami in Florida. The Rickenbacker Causeway is named after Eddie Rickenbacker, a WWI vet and founder of Eastern Air Lines. The original work on the bridges began in 1926, and in 1947 it was...
Completed column and pier cap

Completed column and pier cap

Case Studies September 20, 2018
The South Carolina Department of Transportation (SCDOT) found corrosion-related deterioration of the pier caps and columns supporting the Butler Road bridge over I-385 in Greenville, S.C., during a routine inspection. The corrosion was caught early enough and was limited to only one column and a...
The Umpqua River Bridge in Oregon was kept in service while structure strengthening occurred in several locations.

The Umpqua River Bridge in Oregon was kept in service while structure strengthening occurred in several locations.

Case Studies January 25, 2018
The Umpqua River Bridge along the Oregon Coast Highway (U.S. 101) in Reedsport, Ore., is a swing-span bridge flanked by two tied reinforced concrete arches on each side. The bridge was opened in 1936 and was added to the National Register of Historic Places in 2005. Due to the age and deterioration...
Subscribe to RSS - Concrete Fiber Reinforcement
Overlay Init