Case Studies

Wilkin County Highway #8 FDR
Wilkin County, Minn., has stabilized an estimated 80 miles of gravel surface roadways and 30 miles of full-depth reclamation projects with the same base stabilizer. The county had a stabilized full-depth reclamation project scheduled for Wilkin County Highway #8 in 2014.   "Due to some unforeseen...
EnviroTech Owl Canyon Road
The Owl Canyon Corridor in northern Larimer County, Colo., is an 11-mile section of Larimer County Road 70 and 72 that serves as an important connection between U.S. Highway 287 and I-25. The westernmost three miles of the corridor is non-paved, consisting of a treated gravel surface.   As the...
Pennsylvania rapid bridge replacement

Copyright, Pittsburgh Post-Gazette, 2018, all rights reserved. Reprinted with permission.

One of the country’s largest construction projects undertaken by a public-private partnership is winding down, and ALL Crane Rental of Pennsylvania was in the thick of it. The ambitious $900 million project saw Plenary Walsh Keystone Partners and the Pennsylvania Department of Transportation (...
NJDOT uses permitting & routing software to save time & money
Prior to 2010, New Jersey handled its oversize/overweight (OS/OW) permitting manually through the Motor Vehicle Commission using a non-route-specific paper process. To increase public safety and protect the state’s infrastructure, however, the New Jersey Department of Transportation (NJDOT)...
LaneGard 3 Folding Type III Barricade is designed for emergency road closures.

LaneGard 3 Folding Type III Barricade is designed for emergency road closures.

After a storm hit northeastern Ohio on March 1, 2018, an estimated 80,000 people lost electrical power as a result. High winds, gusting as strong as 50 mph, brought many power lines down, and numerous road closures were reported throughout the area. The storm, severe enough to earn its own name,...
Lafayette, Ind., bridge
The city of Lafayette, Ind., is nearing completion of a years-long process to update one of its main thoroughfares, a 2.5-mile stretch of Sagamore Parkway. Cranes provided by Central Rent-A-Crane, a member of the ALL Family of Companies, are playing a crucial role in completion of the project.  ...
pavement repair
Pa. Rte. 66 is a 139-mile southwesterly-northeasterly route in the northwest area of the state. In April 2003, Jones Township (Pa.) Highway Superintendent Jeff Roberts was deciding how to conduct a repair on this critical route. The affected area was continually failing and needed constant repairs...
Emergency cleanup team in Texas puts excavators to work
Emergencies happen, which is why special services teams are assembled in districts throughout Texas—each armed with equipment that can travel quickly to locations such as the Houston area as it struggled to recover following Hurricane Harvey in September 2017.   Matthew Heinze, Austin district...
The Umpqua River Bridge in Oregon was kept in service while structure strengthening occurred in several locations.

The Umpqua River Bridge in Oregon was kept in service while structure strengthening occurred in several locations.

The Umpqua River Bridge along the Oregon Coast Highway (U.S. 101) in Reedsport, Ore., is a swing-span bridge flanked by two tied reinforced concrete arches on each side. The bridge was opened in 1936 and was added to the National Register of Historic Places in 2005. Due to the age and deterioration...
To meet state and federal reporting requirements, the Oregon Department of Transportation (ODOT) must know what assets it has and where they are located. This challenge is complex because the network with which it is associated is constantly changing, and the linear nature of roadway information is...
The Motor Carrier Division of the Maryland State Highway Administration (MDSHA) issues up to 150,000 oversize/overweight (OS/OW) permits per year for travel on more than 10,000 miles of roads, passing over and under approximately 5,200 bridges and underpasses. The permitted routes cross city, state...
BoardWalk Ramp and Platform with detectable warning stripe
The city of Toronto, Canada, launched the King Street Transit Pilot Project in November 2017. The purpose of the project is to improve transit reliability, capacity and speed. Giving priority to streetcars, the project does not allow personal vehicles through certain intersections along King Street...
Backed by Bridgestone, Firestone VersaBuilt tires are designed to perform across a wide variety of environments, applications and equipment to keep jobsites operating efficiently.   Tony Perrotti, operations manager for JR Hayes Corp., a site development contractor in the Pacific Northwest, has...
The widening of a road around the south end of popular Lake Winnipesaukee in Alton Bay, N.H., created a steep slope (1H:1V) adjacent to the roadway. Concern that potential erosion and washout would occur during heavy rain events made stabilization of the 52-ft slope necessary.   Project objectives...
Operating a flat saw takes skill, knowledge and endurance. It also takes having the right flat saw and the right diamond blade paired for the job. When these factors—skilled operator, flat saw and diamond blade—come together, a project even with its own unique set of circumstances can go smoothly...
Champlain bridge foundations
The new Champlain Bridge spanning 3.4 km over the St. Lawrence River between Montreal and Brossard, Quebec, is being constructed alongside the current aging Champlain Bridge. The concrete-and-steel bridge is being built with an expected lifespan of 125 years. All work is being done under the...
Column repair S.C.
In June of 2016, the South Carolina Department of Transportation (SCDOT) was in the midst of building a new interchange at the intersection of I-85/I-385 in Greenville, S.C. During construction, severe localized spalling was found on the cover concrete of one column of a two-column pier supporting...
Cranes
A nearly decade-long federal push to upgrade railroad tracks and bring high-speed rail service between the Midwest metropolises of Chicago and St. Louis is getting closer to fruition. Central Contractors Service of Crestwood, Ill., a member of the ALL Family of Companies, played a critical role in...
I-76 Work zone
As the prime highway contractor, Shelly & Sands recently installed temporary portable rumble strips (TPRS) in a work zone in Mahoning County, Ohio. The concrete joint repair project was located on I-76/I-80 eastbound, between Bailey Road and the Ohio Turnpike, in the Warren-Youngstown area.  ...
Salt brine Minnesota
The city of St. Cloud and county of Anoka in Minnesota were both looking to enhance the performance of their salt brine operations. In 2015, St. Cloud used over 81,000 gal of salt brine and purchased 2,290 tons of salt. Anoka County is responsible for maintaining and clearing snow and ice from 423...
Overlay Init