|
|
 |
What are the city's limits?
Roads & Bridges
August 2003
Brian Stotler, Contributing Author
A traffic control system will only be as good as the information collected and used to design and operate it. Continuous monitoring for changes in traffic demand and volume should be considered during the system's engineering stage of the project. This can be done in several ways.
|
|
|
|
|
|
|