A Love Triangle
Roads & Bridges
April 2007
By Jim Kinder, P.E.
As MoDOT’s $260 million redesign of Kansas City’s notorious Triangle comes to a close, motorists are feeling more positive about the drive
|
|
Ready with cold remedies
Roads & Bridges
May 2005
Rodney Garrett
there are contractors specializing in cold (pavement) planning who collectively perform this service nationwide. Nevertheless, as with any other special services contractors, their workmanship quality, services and expertise can vary.
|
|
Thriving in Dense, Urban Areas
Roads & Bridges
September 2002
Allen Zeyher
Large, complicated jobs like the Brooklyn-Queens Expressway give Slattery Skanska a chance to develop innovative solutions to engineering, logistical and construction challenges.
|
|
Blazing a trail
Roads & Bridges
November 2001
Allen Zeyher
Design-build writes new signature for Milwaukee when replacing a deteriorating viaduct.
|
|
|
|
|
|
|
|
Boston Unclogs its Central Artery
Roads & Bridges
April 1998
edited by Larry Flynn
Big Dig' construction vehicles allotted 90-minute turn-around time from batch to pour
|
|
Soft-Metricated Rebar Becomes Reality when Adopted as a Metric Standard
Roads & Bridges
January 1997
Jeanne Anderson
The use of soft-metricated reinforcing steel as the metric standard for rebar in the U.S. has been officially adopted. Specifications for soft-metric
rebar are now available from American Society for Testing and
Materials (ASTM) and the American Association of State Highway &
Transportation Officials (AASHTO).
|
|
|
|